Skip to content

CementBY

Author: Bartosz Achterberg-Nowak

Concrete does not fail because of the concrete. It fails because the ground underneath was wrong, the weather was wrong, or somebody added water on site to make life easier. I write about the sub-base, the curing and the joints — the three things nobody photographs and everybody skips. Forty-three years of pours taught me that the pour itself is the easy part and the hour before it decides everything.
  • Home
  • Bartosz Achterberg-Nowak
  • Page 13
Consistent Risers or Somebody Falls
11 min 0
  • Paving

Consistent Risers or Somebody Falls

  • Bartosz Achterberg-Nowak
  • June 15, 2026
I once spent a Tuesday afternoon watching a lad—barely old enough to shave—trying to figure…
Read More
Temporary Works Need Designing Too
10 min 0
  • Masonry

Temporary Works Need Designing Too

  • Bartosz Achterberg-Nowak
  • June 14, 2026
I remember standing on a site in ’94, watching a lad try to slide a…
Read More
Curing Compound Versus Polythene
8 min 0
  • Concrete

Curing Compound Versus Polythene

  • Bartosz Achterberg-Nowak
  • June 12, 2026
I remember standing on a job site in ’98, watching a lad spray a cheap,…
Read More
Backfill Compacted in Layers or It Settles
12 min 0
  • Groundwork

Backfill Compacted in Layers or It Settles

  • Bartosz Achterberg-Nowak
  • June 11, 2026
I remember standing on a site in ’98, watching a lad dump three feet of…
Read More
Cutting an Opening Without Dropping the Wall
8 min 0
  • Masonry

Cutting an Opening Without Dropping the Wall

  • Bartosz Achterberg-Nowak
  • June 9, 2026
I remember standing on a site in the mid-nineties, watching a lad try to “figure…
Read More
The Complete Guide to Paving
11 min 0
  • Guides

The Complete Guide to Paving

  • Bartosz Achterberg-Nowak
  • June 9, 2026
I remember standing on a driveway in Surrey back in ’08, watching a lad lay…
Read More
Resin Bound Needs a Sound Base
8 min 0
  • Paving

Resin Bound Needs a Sound Base

  • Bartosz Achterberg-Nowak
  • June 8, 2026
I’ve spent forty-three years watching men chase after the “perfect finish” while completely ignoring the…
Read More
Pipe Bedding and Surround Material
10 min 0
  • Groundwork

Pipe Bedding and Surround Material

  • Bartosz Achterberg-Nowak
  • June 5, 2026
I remember standing on a site in ’94, watching a lad shovel loose muck into…
Read More
Seven Days of Curing Is Not Optional
8 min 0
  • Concrete

Seven Days of Curing Is Not Optional

  • Bartosz Achterberg-Nowak
  • June 4, 2026
I remember standing on a site in North Yorkshire back in ’94, watching a lad…
Read More
Air Testing Before You Backfill
8 min 0
  • Groundwork

Air Testing Before You Backfill

  • Bartosz Achterberg-Nowak
  • June 1, 2026
I remember standing in a muddy trench outside of Leeds back in ’94, watching a…
Read More

Posts pagination

Previous 1 … 12 13 14 … 24 Next

Recent Posts

  • Lead Detailing That Actually Sheds Water
  • Choosing Machine Size for the Access
  • Repairing Back to Sound Concrete
  • Chimneys Get the Worst Weather and the Least Attention
  • The Complete Guide to Ground Bearing Slabs

Recent Comments

No comments to show.
Copyright © 2026 CementBY Theme: Glowing Blog By Adore Themes.